Modelling simulation using tecnomatix plant simulation 15
$30-250 USD
Πληρώθηκε κατά την παράδοση
Sewing tool packaging production line. Every week will send products include the stuff require to pack the sewing tools. So, I need to build a model simulation that will determine how many days products will ready to ship back the factory.
Ταυτότητα Εργασίας: #30620675
Σχετικά με την εργασία
1 freelancer κάνει προσφορά κατά μέσο όρο $200 για αυτή τη δουλειά
Hi, please let me know the aspects of this project, the requirements, and if you have any documentation on what should be done. Thanks