Plant safety improvment using Schneider PLC/SCADA

Σε Εξέλιξη Αναρτήθηκε Πριν 6 χρόνια Πληρώθηκε κατά την παράδοση
Σε Εξέλιξη Πληρώθηκε κατά την παράδοση

Motivation:

This project is motivated by the need of an automated safety system for the steam generating unit of a company. This system is required in the company following an accident that occurred in the company due to a miss communication between the maintenance and operation teams that resulted in collapse of a tank. A safety relief valve used to maintain pressure inside the tank was removed during maintenance and the operation team resumed operation before the valve was restored leading to a vacuum in the tank that lead to the collapse of the tank. By having a system to automatically monitor pressure inside the tank and alert the operation team in case of pressure imbalance, such accidents can be minimized considerably. In all industries, equipment such as motors, pumps, belts, gear trains and couplers are subject to wear and tear during use that would eventually result in unscheduled shutdown. Cavitation one of the areas of interest of this research results in deterioration of performance of pumps that may lead to failure of the pump. These unscheduled shutdowns lead to idle personnel and equipment that are usually expensive to maintain. By early detection of cavitation, these maintenance costs can be avoided. The motivation for this

project therefore is to design a cost effective, efficient system that automatically diagnoses pumps for degradation and cavitation to be able to predict pump failure thus decrease the large costs associated with idle equipment and personnel due to unscheduled shut downs.

Objectives:

The main objective of this project is to develop a system that would improve safety in a steam production unit by use of sensors interfaced to a controller which controls actuators such as valves and an alarm. This main objective would be based on an accident that happened in a steam production unit of the company. Another major objective is to design a system for automatically monitoring cavitation in a water pump. To achieve these objectives, research must be done on the safety measures that are currently used in a steam production plant of a chemical products company, possible areas and areas disposed to accidents should be identified, causes, effects and ways of detecting cavitation have to be investigated then

systems designed to improve safety of the steam production unit and to monitor cavitation.

Σχεδιασμός Κυκλωμάτων Ηλεκτρική μηχανολογία Ηλεκτρονικά Μηχανολογία Μηχανική Μηχανολογία

Ταυτότητα Εργασίας: #16423497

Σχετικά με την εργασία

9 προτάσεις Απομακρυσμένη εργασία Ενεργό Πριν 6 χρόνια

Ανατέθηκε στον:

mha593efed516da0

I am electrical engineer .I have lot of experience working with various employers globally. Can I do Circuit Analysis and design, Power System Analysis,DC/AC machines Electrical Distribution , translation and techn Περισσότερα

$35 AUD σε 1 μέρα
(12 Αξιολογήσεις)
3.1

9 freelancers κάνουν προσφορές κατά μέσο όρο $213 για αυτή τη δουλειά

olaideejiwole

I have high proficiency in Electrical Engineering,Mechanical Engineering, Electronics, 3D Rendering, AutoCAD, Building Architecture,Engineering, Microcontroller, HVAC Mechanical ,PCB Layout,Matlab, Arduino and have b Περισσότερα

$10 AUD σε 1 μέρα
(1 Κριτική)
0.0
sunkarasravanthi

A proposal has not yet been provided

$25 AUD σε 1 μέρα
(0 Αξιολογήσεις)
0.0
zayedgrp

Electric power & control Engineer, have experience with PLC programming and have the ability to implement your project as you like at the time. I can start from now

$35 AUD σε 3 μέρες
(0 Αξιολογήσεις)
0.0
Malikkhuram111

I have Experienced in that. Relevant Skills and Experience QHSE Manager in oil and gas

$25 AUD σε 1 μέρα
(0 Αξιολογήσεις)
0.0
abialaoludayo

I've worked with SCADA and Schnieder systems in a telecomms company and will love to apply my knowledge in your project Relevant Skills and Experience Electrical/Electronics Engineering

$25 AUD σε 1 μέρα
(0 Αξιολογήσεις)
0.0
leongovindsamy

There is much more to evaluate and investigate apart from ensuring that the Safety system trips are in place and early indication of pump degregation. MOC procedure req. Possible redundant pumps? Relevant Skills and E Περισσότερα

$622 AUD σε 5 μέρες
(0 Αξιολογήσεις)
0.0
IOanalOg

I m currently using PLCs for the safety of hydroelectric power plant. We have 40 bar pressure tanks for the gate operatings. dozens of pressure and temperature sensors we are using for safety. Working and maintenance Περισσότερα

$1111 AUD σε 1 μέρα
(0 Αξιολογήσεις)
0.0