dataentry1
$250-750 USD
Πληρώθηκε κατά την παράδοση
AGREEMENT
For Construction of ____________________________________________
This Agreement is made at Islamabad on this _____ day of _____________ between Mr. Afzaal Rao S/o Muhammad Yasin, R/o Korang Town, House No. 36, Gali No. 12, Islamabad, NIC No. 61101-1863925-7 (hereinafter called the first party / Contractor), of the one part AND _________________________________________________________________(hereinafter called the second party / owner) of the other part, whereby agreed as under:-
A. Covered Area and Rate per Square foot of the Covered Area for structure .
1. Covered Area __________ [url removed, login to view]
2. With Material Rate @ [url removed, login to view] per [url removed, login to view]
B. Scope of Work
1. Layout of the building
2. Excavation of site;
3. Foundation Work
4. Termite proofing in foundation
5. Masonry work in foundation and in super structure like:
(i) Retaining walls (ii) Beams (iii) Lintels (iv) RCC roof (v) RCC columns (vi) RCC Slab (vii) Other RCC structure i.e. for UGWT, OHWT and Rainwater harvesting
6. UGWT, OHWT and Rainwater harvesting tank (seepage proofing)
7. Damp proofing and back filling of the area
8. Roof Treatment (To be charged additional)
9. Providing stairs as per approved plan
10. Boundary wall and fixing of the main gate
11. Pardi Wall over sheds
12. Boundary wall
13. Site clearance and removal of all extra material
C. Material Specification
1. A class brick Rs. 5000 / - / 1000 bricks
2. Steel (KSR) of different dia and grade 40 / 60 as per need (steel out of billsets)
3. Bestway Cement
4. Margalla Crush of different size
5. Laurenspure sand
6. Adam Jee electrical conduits for roof
D. Time Period
_______ Working days starting from this issue of cheque
E. Schedule of Payment
25% -Advance for mobilization and start construction
25% -On completion lower ground roof slab 25% -On completion of ground floor roof slab
25% -On completion of first floor roof slab 10% -On completion of rest of all structural work like
-OHWT boundary wall gate and columns etc.
In witness whereof, both parties have put their respective hands in the presence of the following witnesses.
Sign (1st Party):_________________ Sign (2nd Party): ___________________
WITNESSES:
1. ___________________________ 2. ___________________________
Ταυτότητα Εργασίας: #2474898
Σχετικά με την εργασία
7 freelancers κάνουν προσφορές κατά μέσο όρο $321 για αυτή τη δουλειά
Hi, I am readily available to start working on your project. Please see PM for further details. Regards